You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
How to apply flashing with a rolled roof.
Prepare roof edges cant strips.
To apply rolled roofing you ll need your roof measurements a broom chalk to mark lines a razor blade to cut the material roofing cement nails and a hammer to hold down the material.
How to install polymer bituminous flashing.
An underlayment of felt roofing is optional.
Provide 6 inches of overlap under each side of the.
There are three systems including glue down torch down and peel and stick.
Visit your local hardware store and ask for enough rolled roofing to fit the area of your roof.
It has just one layer so it goes.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
A typical roof has three layers a felt layer and two layers of overlapping shingles.
Roll roofing is different.
Roll roofing is made from the same asphalt composition material as shingles and it s easier to install.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
How to install roll roofing on low slope roofs.